onsdag 20. januar 2010

Stairs to heaven

It is dangerous to say too much positive about a vendor before the actual delivery, but after just ordered stairs from Nor-Trapp I have to say I am very pleased with the service so far. We had agreed that I would make the final measurements and take some photos when I was up there last week and e-mail over when I got home. I did on tuesday, and 2 hours later everything had been drawn in 3D, delivery date agreed and order confirmation sent. It actutally got a little cheaper than their first initial offer too. And the prizes are very reasonable I think, considering we are getting it delivered all painted in white with brown stained steps.




The original stairs that are delivered with the cabin (or actually Familiehytta never delivered ours, maybe I mentioned to them at one point that I would find another solution?) is a straight and very steep thing, not very friendly for small kids playing and forgetting all about the laws of gravity. We moved the entrance door all the way to the left in the hallway, moved the "knevegg" at the opening for the stairs further out and got room for stairs that have a 90 degree bend, resulting in 4-5 more steps than the original one. The stairs will still be fairly steep, but at least there will be a sharp bend to slow down anyone falling down:) It will be better looking too, and we didn't have to move any walls to improve the solution.

mandag 18. januar 2010

Another week?

Every weekend I have been up at cabin I have been thinking in the car on my way home; if I only had two more days, I would have gotten "this and that" done.... After just spent a week at cabin I am thinking; if I just had one more week... Guess the cabin would have been more or less done if that was the case. So the status after one week of more or less hard work is:

- Put 640 kg of grout/avrettingsmasse on the heating cables is the two hallways
- Laid the floor in the living room
- Floor in the second bedroom downstairs
- Gotten all the panel in living room up (except where the chimney is going up)
- Recieved and mounted the kitchen cabinets, countertop, most of the doors and some of the drawers/interior
- Put panel all over the sauna
- Installed door to the guest bedroom and the small bathroom
- Stained the floor in guest bedroom
- Completed most of the trimmings in guest bedroom
- Picked up sofa and dinner table with chairs and assembled them

Had some company this time two, the first weekend with friend Karl who helped out with the grout and half of the living room floor. And during the later part of the week my dad came for a couple of days and got the place tidied up and organised a bit again, as well as helping out with kitchen.

The IKEA kitchen arrived the they as they promised and I was a bit worried if they would make it up there as rumours have it that they had some trouble with delivering in same area just before christmas. Luckily they made it all the way up but the driver insisted on trying to back up the driveway which was a bit optimistic on the hilly road, and he ended up just sliding more and more down the road on his attempts before he finally gave up and decided just to carry it the 20 meters up the road and leave everything in the driveway. Convinced them to at least carry the dishwasher and the fridge inside the cabin before they left, still leaving me with the rest of the kitchen, bathroom interior, 4 beds, 8 chest of drawers to carry inside on my own.... My back is still complaining! But really I am just glad the got it as far as they did, and I am very pleased with the (almost) end result after putting it all together.




The only thing I didn't get done as planned was the tiles in the hallways as all the elements for the chimney got delivered and put on the floor on tuesday, while the whole assembly got delayed to this week, really didn't feel like lifting and moving that much more so the tiles will be done on next trip up instead.

Beside the tiles, main focus will now be on th bathrooms as that is really the only thing missing to give the cabin all the qualities we need for all of us to spend time there. And I hope electrician will come and install electricity in all the rooms that are done now, including the kitchen as that will make life a lot easier:)



mandag 4. januar 2010

SALE!

Normally I am not too excited about the January sale, as I am generally not too excited about sales or shopping in general...but now, a sale is a great thing. The cabin needs furniture for obvious reasons! So this weekend a dinner table, 8 chairs, sofa and 2 mattresses were secured and, with the exception of the sofa which will arrive later, all transported home to the garage awaiting further shipment. Not really a whole lot more we need now as we have some leftover furniture after joining our households in 2009. But I have started to look for a stuffed grouse to have on the living room wall, so if anyone has one to sell let me know. Guess it should be one that I have shot myself, but with the last years outcome after the hunting season I am not taking the chance of waiting…