mandag 22. februar 2010

It all tiles up....

Bit of a rat race now, we definetly want to spend easter at cabin, preferably with all the luxuries that hot running water, working stove, oven, lights etc provide. As the schedule turns out I'll only have 2 more free weekends to go to cabin before easter so it is getting close...

However I did manage to get 80% of the tiles in both bathrooms done this weekend so the upcoming weekend I'll head back up and finish it and get all the grouting done and all corners etc siliconed. Both the electrician and the plumber have been told to start next week, so I better succeed...oh, and I also need to at least start the panelling the two remaining walls up at the attic so the electrian can mount all sockets. Should be ok...phew.

Then focus the 2nd weekend before easter will be tiles in hallway and putting up the stairs so the kids can actually access their bedrroms upstairs...not having 4 kids in our bed!! :)

Will be nice to get power throughout the cabin now, it is a hassle dragging extension cords all over the place, and look forward to have a somewhat more cosy lighting than two 500 watts working lamps illuminating the place like Old Trafford! Not to mention the luxury it will be to eat something else than microwave dinners!!

We are getting there!


Oh and I almost forgot, the chimney guy (who seems to work a couple of hours every week, but still making some weekly progress), had brought in the fireplace we ordered, and it looked really good! Now it only needs to be connected, and of course the chimney should be built higher and through the roof, and not stop halfway through the attic....but 3-4 more weeks and he will probably get there:)